| Product Description
120-200kW EV DC CHARGER
Consant power from 200-1000VDC
Average efficiency ≥96% at nominal output power
One charger with two outputs, simultaneously charging
Ethernet/3G/4G/OCPP communication
High protection grade as IP54
APP operation or RFID authentication or plug and play
C certificate NB 1282
OEM/ODM
LOGO customize
|
Techdata sheet
Model | THGZQW-120/140/160/180/200kW | |
Phases/Lines | 3 phases+neutral+PE | |
Voltage | 380VAC±20% | |
Frequency | 50Hz±10% | |
Power | 120 /140/ 160 /180 /200kW | |
Voltage | 200-1000VDC | |
Current (max.) | CCS 2 200A,CHAdeMO 125A,GB/T 250A | |
Cable Lenth | 5m | |
Connector | CCS 2 or CHAdeMO or GB/T,Up to 2 charging guns | |
Power Factor | ≥0.99 | |
THD Value | ≤5% | |
Stable Voltage Accuracy | ≤±0.5% | |
Stable Current Accuracy | ≤±1% | |
Efficiency | ≥96% at nominal output power | |
Housing Material | Galvanized steel | |
Installation Method | Floor-stand | |
LED Indicator | 7 inches | |
Emergency Stop Button | Mushroom headed type | |
Payment Method | RFID CARD | |
External | Ethernet, and 3G/4G | |
Communication Protocal | OCPP1.6J | |
Working Temperature | -30ºC-+55ºC | |
Working Altitude | ≤2000M | |
Application Site | Indoor/Outdoor | |
Cooling Method | Forced air cool | |
Multiple Protection | Over Current, Under Current, Over Voltage, Residual Current, Surge Protection, Short Circuit, Earth Fault at input and output, Input Phase reversal, Emergency Shut-down with alarm, over temperature, Protection against electric shock. | |
Product Dimension | 550*850*1950mm(W*D*H) | |
Net Weight | 180KG | |
External Packing | Wooden case |
| Automated production
|
FAQ
1.Whether the charging point can be remotely controlled?
-Yes
2.Whether the higher the power of the charging point, the faster the charging will be?
-Not always. The actual output power during the charging process depends on the vehicle demand. When the power of the charging point is less than the vehicle demand, the higher the power, the faster the charging. When the power of the charging point is greater than the vehicle demand, the charging speed will not be increased by increasing the power.
3.How about your delivery time?
-Generally, it will take 7 to 25 days . The specific delivery time depends on the items and the quantity of your order.
| Success Case
| Testing Quality
| Product Description
120-200kW EV DC CHARGER
Consant power from 200-1000VDC
Average efficiency ≥96% at nominal output power
One charger with two outputs, simultaneously charging
Ethernet/3G/4G/OCPP communication
High protection grade as IP54
APP operation or RFID authentication or plug and play
C certificate NB 1282
OEM/ODM
LOGO customize
|
Techdata sheet
Model | THGZQW-120/140/160/180/200kW | |
Phases/Lines | 3 phases+neutral+PE | |
Voltage | 380VAC±20% | |
Frequency | 50Hz±10% | |
Power | 120 /140/ 160 /180 /200kW | |
Voltage | 200-1000VDC | |
Current (max.) | CCS 2 200A,CHAdeMO 125A,GB/T 250A | |
Cable Lenth | 5m | |
Connector | CCS 2 or CHAdeMO or GB/T,Up to 2 charging guns | |
Power Factor | ≥0.99 | |
THD Value | ≤5% | |
Stable Voltage Accuracy | ≤±0.5% | |
Stable Current Accuracy | ≤±1% | |
Efficiency | ≥96% at nominal output power | |
Housing Material | Galvanized steel | |
Installation Method | Floor-stand | |
LED Indicator | 7 inches | |
Emergency Stop Button | Mushroom headed type | |
Payment Method | RFID CARD | |
External | Ethernet, and 3G/4G | |
Communication Protocal | OCPP1.6J | |
Working Temperature | -30ºC-+55ºC | |
Working Altitude | ≤2000M | |
Application Site | Indoor/Outdoor | |
Cooling Method | Forced air cool | |
Multiple Protection | Over Current, Under Current, Over Voltage, Residual Current, Surge Protection, Short Circuit, Earth Fault at input and output, Input Phase reversal, Emergency Shut-down with alarm, over temperature, Protection against electric shock. | |
Product Dimension | 550*850*1950mm(W*D*H) | |
Net Weight | 180KG | |
External Packing | Wooden case |
| Automated production
|
FAQ
1.Whether the charging point can be remotely controlled?
-Yes
2.Whether the higher the power of the charging point, the faster the charging will be?
-Not always. The actual output power during the charging process depends on the vehicle demand. When the power of the charging point is less than the vehicle demand, the higher the power, the faster the charging. When the power of the charging point is greater than the vehicle demand, the charging speed will not be increased by increasing the power.
3.How about your delivery time?
-Generally, it will take 7 to 25 days . The specific delivery time depends on the items and the quantity of your order.
| Success Case
| Testing Quality